|
Produktdetails:
|
| Inspektionsstandard: | ASME Abschnitt I und VIII, PED | Designdruck: | Bis zu 25 MPa |
|---|---|---|---|
| Korrosionszuschlag: | 3 mm Standard | Anwendung: | Dampfverteilung in Kraftwerken und Industriekesseln |
| Hersteller: | Sat-Cham-Gesellschaft | Gewicht: | Abhängig von Größe und Material, typischerweise 100 kg bis 5000 kg |
| Verbindungstyp: | Geflanscht / geschweißt / mit Gewinde | Oberflächenbehandlung: | Lackieren / Verzinken / Isolieren |
| Hervorheben: | Boiler Steam Header with impact test,Boiler Steam Header strength calculation,Boiler Steam Header inspection reports |
||
|
Diameter(OD)
|
¢76mm~¢914mm
|
|
Length(Max)
|
23000mm
|
|
Temperature(℃)
|
300~1500
|
|
Brand
|
SAT-CHAM |
Application:
air cooler, fired heater, heat exchanger, marine boiler, economizer, power plant boiler, HRSG boiler, waste heat recovery unit, air heater etc
Characteristic:1.Anti-corrosion2.Anti-wear3.Lower contact resistance 4.Higher Stability
Our products can be modified according to our customers' needs and the situation.we design and manufacture safe,reliable and efficient H-fin tubes.it has also completed stand-alone product quality assurance systems.Production of H-fin tubes are with high heat transfer efficiency, they have flue gas resistance and are designed for a small space.
| Technical parameters | The high degree of fin 0-16mm(or outside diameter of fin φ25-φ75); Pitch of fins 2.0-5.0mm; Length of finning tube 0.5~ 14m. |
| Single metal rolling finning tube | Pure aluminum 1060 or aluminum alloy 6063,6061. Outside diameter Shall be less than 40mm |
| Double metal rolling finning tube | Tube-based protection from the outer layer of aluminum tubes,corrosion-resistant,Tube-based can be made of carbon steel pipe,in addition to,stainless steel tube and copper tube can also be used, as well as titanium alloy tube |
| Package | The aluminum finned tubes are well packed in plastic film in the inner and steel fram in the outer |
Q1: How long is the warranty period?
We provide 18 months warranty for all spare parts(exclude fragile parts).
Q2: How can we guarantee quality?
1 All machines are in strict accordance with the ISO quality and CE system requirements.
2 Each procedure is crafted by professional Skilled labour, followed by particular QC
3 All information of our products can be checked in efficient management system.
Q3: What can you buy from us?
Boiler Economizer, Boiler Fin tube, Boiler Air preheater, Boiler superheater, Boiler membrane wall,
Boiler manifold headers and other pressure spare parts.
Q4: What kind of service do you provide?
Before sales:
Provide productinformations, market research forecasting, product customization,product processing,consultation and other services for your convenience.
Q5: Are you a factory or trading company, where are you located?
We are a factory, just 130km(2 hours by car) away from Shanghai Airport.
We offer pickup service at Shanghai for your visit.![]()
![]()
![]()
![]()
Ansprechpartner: Mr. Chen
Telefon: +8615150235238